Engineering Tripos Part IIA Project, GF1: Control Systems, 2023-24

Engineering Tripos Part IIA Project, GF1: Control Systems, 2023-24

Not logged in. More information may be available... Login via Raven / direct.

PDF versionPDF version

Leader

F Forni

Timing and Structure

Fridays 11-1pm, Tuesdays 9-11am plus afternoons

Prerequisites

3F1 & 3F2 useful

Aims

The aims of the course are to:

  • The project will involve the modelling and control of an 'evaporator', which is a process used in many industries (eg. dairy products, chemicals).
  • As a first step a simulation model will be built and tested.
  • Then a control system will be designed for the process, and its performance checked by simulating its operation with the evaporator.
  • Modern simulation and analysis software will be used throughout.

Objectives

As specific objectives, by the end of the course students should be able to:

  • To take students through the simulate/analyse/design/test cycle for an industrial control system (unfortunately omitting implementation).
  • To expose students to state-of-the-art software for control engineering.
  • To give students experience of simulating dynamic systems.

Content

For the first three weeks students will work in pairs, with all pairs producing similar simulation models. For the final week, students will work in groups of 4, with each group having the option of using a different methodology for designing the final control system.

Week 1

Familiarisation with Simulink simulation and Matlab software. Familiarisation with description and mathematical model of evaporator. Construction and test of Simulink model of the evaporator.

Week 2

Completion of testing Simulink model of the evaporator. Refining the model. Closing one control loop. First interim report.

Week 3

Initial control design for the whole model. Investigation of performance when model behaviour changes. Investigation of integrator wind-up. Second interim report.

Week 4

Group Activity. Choice of further control system design project. Final report.

Coursework

Coursework Due date Marks

Interim report 1

Friday 17 May 2024 (4pm)  20

Interim report 2

Friday 24 May 2024 (4pm) 

20

Final report

Friday 7 June 2024 (4pm) 

40 (of which 20 are group work)

 